Saturday, 20 December 2014

Work Progress


 31.12.14

27.12.14

 
 PCC WORK 25.12.2014



 LIFT AREA

Sand Filling Work

Thursday, 11 December 2014

Foundation Plinth work


Beam PCC base work begins 03.12.2014

Base work progresses 04.12.14

Beam work begins 06.12.2014

1st beam frame work complete 08.12.14


 Work Status 10.12.14


Brick Shuttering 10.12.14 




12.12.14




15.12.14

 
 Septic tank location

Site preparation work/ excavation

Excavation work started.


1st Layer excavated


Final Excavation and leveling done manually


Entrance 27.11.14





















Introduction

Site photos from ongoing construction of Market and Tower at Padam Chowk, Giridih are updated here!!